Ministry of Infrastructure Pa r t n e rs h i p P ro j e c t s February 07, 2020 https://infraestrutura.gov.br/concessoes/ Partnership Projects Airports Ports Highways Railways SFPP - ref: february 02, 2020 2 Airports Partnership Projects SFPP - ref: february 02, 2020 3 Airports – Project Portfolio Boa Vista RR AP 7th Round North 2 Block Macapá Belém Santarém 6th Round North 1 Block Tefé 6th Round Central Block São Luis Júlio César Manaus Altamira Tabatinga AM Teresina PA Marabá MA CE RN Imperatriz Carajás Cruzeiro do Sul PB PI Porto Velho PE AC TO Petrolina Palmas Rio Branco AL SE RO BA MT GO Projects: By the Numbers Montes Claros DF Goiânia MG Investments US$ 3 Bi : • US$ 1.68 billion – 6th Round • US$ 1.32 billion – 7th Round Corumbá 7th Round São Paulo/ Mato Grosso do Sul Block Uberlândia ES BH/Pampulha Uberaba MS Campo Grande Carlos Prates 7th Round Rio de Janeiro/ Minas Gerais Block RJ Airports 45 airports: • 22 airports – 6th Round • 19 airports – 7th Round •Disposals of Infraero (4) Ponta Porã Londrina ‘’ 6th Round 7th Round Infraero SC RS Uruguaiana Bagé Santos Dumont Congonhas Curitiba (2) Joinville Foz do Iguaçu Highways existing SFPP - ref: february 02, 2020 Campo de Marte PR Projects Jacarepaguá SP Navegantes 6th Round South Block Pelotas 4 Airports – Project Portfolio Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction -6th round - South Block (9) 3rd Trim. 2020 4th Trim. 2020 3rd Trim. 2020 4th Trim. 2020 3rd Trim. 2020 4th Trim. 2020 1st Trim. 2022 2nd Trim. 2022 -7th round – Rio de Janeiro/Minas Gerais Block (7) 1st Trim. 2022 2nd Trim. 2022 -7th round – São Paulo/Mato Grosso do Sul Block (5) 1st Trim. 2022 2nd Trim. 2022 -6th round – North 1 Block (7) -6th round - Central Block (6) -7th round – North 2 Block (7) Consulting Contracts Development of studies Internal decisionmaking Financial advisor hiring Carrying out the sale -Disposals of Infraero shares (4) 4th Trim. 2020 12/04/2019 SFPP - ref: february 02, 2020 Completed 5 In progress To be performed Disposal of Infraero Shares: Guarulhos/SP, Brasília/DF, Galeão/RJ and Confins/MG Airports of Guarulhos/SP, Brasília/DF, Galeão/RJ and Confins/MG Consulting Contracts 12/04/2019 Guarulhos Development of studies Internal decisionmaking Financial advisor hiring Carrying out the sale 4th Trim. 2020 • It is proposed that the sale of Infraero's shareholdings in the concessionaires of the Guarulhos/SP, Brasília/DF, Galeão/RJ and Confins/MG airports be carried out by Infraero itself, together with the other relevant bodies of the Secretariat of National Civil Aviation. • There was an adjustment in art. 9 of Resolution PPI nº 14/2017, in order to indicate Infraero as entity responsible for conducting the sale process. • Infraero notice published for hiring of a specialized company to carry out the studies. http://licitacao.infraero.gov.br/portal_licitacao/servlet/DetalheLicitacao?idLi citacao=153804 6 SFPP - ref: february 02, 2020 INFRAERO SHARES DISPOSAL FLOW CHART New Resolution CPPI (CPPI) CA proposition (Infraero) Approval of the General Meeting (Infraero) Consulting Contracts (Infraero) Current phase: selection of the winning company and analysis of resources Valuation (CONSULTING) Modeling (CONSULTING) Valuation (CONSULTING) New Shareholders' Agreement (CONSULTING) Publication of Conditions of Sale (Infraero) Sale and Contract Signing (CPPI) SFPP - ref: february 02, 2020 7 Airport – 6th round - South Block Airports of Curitiba/PR, Foz do Iguaçu/PR, Londrina/PR, Bacacheri em Curitiba/PR, Navegantes/SC, Joinville/SC, Pelotas/RS, Uruguaiana/RS e Bagé/RS. SFPP - ref: february 02, 2020 Studies Public hearing TCU (Federal court of accounts) Bidding Documents 3rd Trim. 2020 Public Auction 4th Trim. 2020 • Block concession: Afonso Pena Airport in Curitiba/PR, Cataratas Airport in Foz do Iguaçu/PR, Ministro Victor Konder Airport in Navegantes/SC, Governador José Richa Airport in Londrina/PR, Lauro Carneiro de Loyola Airport in Joinville/Bacacheri Airport in Curitiba/PR, Pelotas/RS Airport, Rubem Berta Airport in Uruguaiana/RS and Gustavo Kraemer Commander Airport in Bagé/RS. • Brownfield projects. • Turnover: 12,2 million passengers. • Expected Investment: US$ 725 million • Concession term: 30 years. • IRR: 7,23%. • Economic vocations focused on tourism events, business tourism and cargo transportation for export and import. The region is home to important industrial hubs in the health and technology sectors. The two largest dry ports in Latin America are in the municipalities of Foz do Iguaçu and Uruguaiana Notice published: http://www.in.gov.br/materia/-/asset_publisher/Kujrw0TZC2Mb/content/id/67422447 8 Airport – 6th round - North 1 Block Airports of Manaus/AM, Tabatinga/AM, Tefé/AM, Porto Velho/RO, Rio Branco/AC, Cruzeiro do Sul/AC e Boa Vista/RR. SFPP - ref: february 02, 2020 Studies Public hearing TCU (Federal court of accounts) Bidding Documents Public Auction 3rd Trim. 2020 4th Trim. 2020 • Block concession: Eduardo Gomes Airport in Manaus/AM, Governador Jorge Teixeira de Oliveira Airport in Porto Velho/RO, Plácido de Castro Airport in Rio Branco/AC, Atlas Brasil Cantanhede Airport in Boa Vista/RR, Cruzeiro do Sul Airport/AC, Tabatinga Airport/AM and Tefé Airport/AM. • Brownfield projects. • Turnover: 4.6 million passengers. • Expected Investment: US$ 420 million • Concession term: 30 years. • IRR: 9,36%. • Economic vocations for the transport of cargo for export, tourism, business tourism, air taxi and as a base of support to neighboring municipalities, regional and national integration. Notice published: http://www.in.gov.br/materia/-/asset_publisher/Kujrw0TZC2Mb/content/id/67422447 9 Airport – 6th round - Central Block Airports of Goiânia /GO, Palmas/TO, São Luís/MA, Imperatriz/MA, Teresina/PI e Petrolina/PE. Studies Public hearing TCU (Federal court of accounts) Bidding Documents Public Auction 3rd Trim. 2020 4th Trim. 2020 • Block Grant: Santa Genoveva in Goiânia/GO, Marechal Cunha Machado in São Luís/ MA, Senator Petrônio Portella in Teresina/PI, Brigadeiro Lysias Rodrigues in Palmas/TO, Senator Nilo Coelho in Petrolina/PE and Prefeito Renato Moreira in Imperatriz/MA • Brownfield projects • Turnover: 7,4 million passengers • Expected Investment: US$ 535 million • Concession term: 30 years • IRR: 8,30%. • Areas with significant agricultural and agribusiness activities. They also have an economic vocation for event tourism, business tourism and regional integration. The international airports of Goiânia, Palmas, São Luís, Teresina and Petrolina are in regions also integrated by road and railway infrastructure, with high potential to interconnect the various regions of the country Notice published: http://www.in.gov.br/materia/-/asset_publisher/Kujrw0TZC2Mb/content/id/67422447 SFPP - ref: february 02, 2020 10 Airport – 7th round – North 2 Block Airports of Belém/PA, Belém – Júlio César/PA, Macapá/PA, Santarém/PA, Marabá/PA, Carajás/PA, Altamira/PA. Studies Public hearing TCU (Federal court of accounts) Bidding Documents 1st Trim. 2022 Public Auction 2nd Trim. 2022 • Block Grant: Belém/PA, Belém – Júlio César/PA, Macapá/PA, Santarém/PA, Marabá/PA, Carajás/PA, Altamira/PA • Brownfield projects • Turnover: 4.6 million passengers • Expected Investment: US$ 295 million SFPP - ref: february 02, 2020 11 Airport – 7th round – RJ-MG Block Airports of Santos Dumont/RJ, Jacarepaguá/RJ, Uberlândia/RJ, Montes Claros/MG, Pampulha/MG, Carlos Prates/MG, Uberaba/MG Studies Public hearing TCU (Federal court of accounts) Bidding Documents 1st Trim. 2022 Public Auction 2nd Trim. 2022 Block Grant: Santos Dumont/RJ, Jacarepaguá/RJ, Uberlândia/RJ, Montes Claros/MG, Pampulha/MG, Carlos Prates/MG, Uberaba/MG • Brownfield projects • Turnover: 11.17 million passengers • Expected Investment: US$ 417.5 million SFPP - ref: february 02, 2020 12 Airport – 7th round – SP-MS Block Airports of Congonhas/SP, Campo de Marte/SP, Campo Grande/MS, Corumbá/MS, Ponta Porã/MS Studies Public hearing TCU (Federal court of accounts) Bidding Documents 1st Trim. 2022 Public Auction 2nd Trim. 2022 Block Grant: Congonhas/SP, Campo de Marte/SP, Campo Grande/MS, Corumbá/MS, Ponta Porã/MS • Brownfield projects • Turnover: 23.55 million passengers • Expected Investment: US$ 602,5 million SFPP - ref: february 02, 2020 13 Ports Partnership Projects SFPP - ref: february 02, 2020 14 Port of Santana/AP Vegetable Bulk Terminal (MCP02) Investiments : U$$ 10.33 million Ports – Project Portfolio Port of Vida do Conde/PA handling and storage of mineral bulk (VDC10) Investiments: US$ 100 million RR AP Port of Itaqui/MA Liquid Bulk Terminals IQI03, IQI11, IQI12 and IQI13 Investiments: US$ 14.67, 16.35, 44.32, 44.62 million Santana Belém Santarém São Luis Port of Fortaleza/CE Passenger Maritime Terminal (TMP) Investiments: US$ 0.4 million Fortaleza Itaituba AM Açailândia Marabá PA Macau CE MA Natal RN Carajás Crato João Pessoa PB Salgueiro PI Recife PE AC AL Aliança do Tocantins RO Barreiros Juazeiro TO Maceió Aracaju Alagoinhas BA MT Salvador Caetité Mara Rosa Ilhéus Rondonópolis Projects: By the Numbers Brasília GO MG Investiments US$ 1.57 billion Ports leasing terminals Port concession terminal 21 Terminals 3 Ports Campo Grande Ponta Porã SP Barra Mansa Bauru São Paulo Cianorte Santos PR Cascavel Porto União Projects São Borja Qualified Under study Railways SFPP - ref: february 02, 2020 Uruguaiana RS RJ Port of São Sebastião Privatization Investiments: US$ 143.6 million Vitória Campos Port of Santos Privatization Investiments: US$ 375 million Rio de Janeiro Port of Santos Terminals STS14; STS14A; STS08 ; STS08A Investiments: US$ 33.47 ; 36.47; 66 ; 252,5 million São Francisco do Sul SC Lajes Cruz Alta Sta. Maria ES Curitiba Paranaguá Guarapuava Sta. Rosa Port of Vitória/ES CODESA Privatization Investiments: US$ 250 million Gov. Valadares Juiz de Fora Panorama Pres. Epitácio Port of Aratu/BA Solid Bulk Terminals (ATU18) Investiments: US$ 29.84 million Pirapora Uberlândia Araguari Belo Estrela Horizonte d’Oeste MS Port of Aratu/BA Solid Bulk Rentals Terminal (ATU12) Investiments: US$ 70.13 million Montes Claros DF Anápolis Goiânia Corumbá Port of Maceió/AL Terminals MAC10; MAC11; MAC12 ; MAC13 Investiments: US$ 3.2; 12.5 ; 7.5 ; 4.5 million SE Sinop Água Boa Port of Recife/PE Liquid Bulk Terminal (REC40) Investiments: US$ 8.75 million Imbituba Criciúma Porto Alegre Port of Paranaguá Terminals PAR12 ; PAR32 Investiments: US$ 5,55 ; 4,95 million Santana do Livramento Rio Grande Port of Paranaguá (PAR50) Investiments: US$ 37,5 million 15 Ports – Project Portfolio Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction - Passengers M. Terminal/CE (PMT) 12/09/2019 03/27/2020 1st Trim 2020 2nd Trim 2020 1st Trim 2020 2nd Trim. 2020 2nd Trim 2020 3rd Trim. 2020 12/02/2019 3rd Trim. 2020 4th Trim. 2020 12/17/2019 3rd Trim. 2020 4th Trim. 2020 05/10/2016 07/13/2017 07/01/2019 10/16/2019 11/08/2019 - Port of Itaqui/MA (IQI03, IQI11, IQI12, IQI13) - Port of Paranaguá/PR (PAR12) - Port of Santos/SP (STS14, STS14A) 10/09/2019 01/15/2020 - Port of Aratu-Candeias/BA (ATU12) - Port of Aratu-Candeias/BA (ATU18) - Port of Paranaguá/PR (PAR32) 3rd Trim 2020 4th Trim. 2020 12/23/2019 3rd Trim 2020 4th Trim. 2020 12/27/2019 3rd Trim 2020 4th Trim. 2020 - Port of Santana/AP (MCP02) - Port of Maceio/AL (MAC10) SFPP - ref: february 02, 2020 Completed In progress To be performed 16 Ports – Project Portfolio Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction - Port of Santos/SP (STS08, STS08A) 4th Trim 2020 1st Trim 2021 - Port of Maceió/AL (MAC13) 4th Trim 2020 1st Trim 2021 4th Trim 2020 1st Trim 2021 4th Trim 2020 1st Trim 2021 - Port of Recife/PE (REC40) - Port of Maceió/AL (MAC11) - Port of Maceió/AL (MAC12) 4th Trim 2020 1st Trim 2021 4th Trim 2020 1st Trim 2021 4thTrim 2020 2nd Trim 2021 - Port of Paranaguá/PR (PAR50) - Port of Vila do Conde/PA (VDC10) - CODESA/ES Privatization 4th Trim 2020 2nd Trim 2021 1st Trim 2022 2nd Trim 2022 1st Trim 2022 2nd Trim 2022 - São Sebastião/SP Privatization -Santos Organized Port /SP Privatization SFPP - ref: february 02, 2020 Completed In progress 17 To be performed PORTS – Passenger Maritime Terminal of Fortaleza/CE Studies TMP-CE 05/10/2016 Public hearing 07/13/2017 TCU (Federal court of accounts) 11/08/2019 Bidding Documents 12/09/2019 Public Auction 03/27/2020 Port terminal located in the Port of Fortaleza/CE, delegated its administration by the Ministry of Infrastructure to the Ceará Docks Company (CDC) (state public company). Brownfield area, with 22,433.17 m2, dedicated to the movement of passengers. • Expected Investment: US$ 0,4 million • Auction criterion: Highest grant • Lease term: 25 years • IRR: 8.84% • PPI Qualification: Qualified in the 11th meeting of the PPI of 11/19/2019 SFPP - ref: february 02, 2020 18 PORTS – Lease on Liquid Bulk Terminal on port of Itaqui/MA TCU Studies Public hearing (Federal court of accounts) Bidding Documents Public Auction IQI03 07/01/2019 10/16/2019 1st Trim 2020 2nd Trim 2020 Port terminal located in the Port of Itaqui/MA, delegated its administration by the Ministry of Infrastructure to the Maranhense Port Administration Company EMAP (state public company). Brownfield area, with 25,726 m2, dedicated to the movement of liquid fuels • Expected Investment: US$ 14.68 million • Auction criterion: Highest grant • Lease term: 25 years • IRR: 9.38% • PPI Qualification: Resolution Nº 52, of May 8, 2019 Notice published: http://portal.antaq.gov.br/index.php/audiencia-publica-no-06-2019/ SFPP - ref: february 02, 2020 19 PORTS – Lease on Liquid Bulk Terminal on port of Itaqui/MA TCU Studies IQI11 07/01/2019 Public hearing 10/16/2019 (Federal court of accounts) Bidding Documents 1st Trim 2020 Public Auction 2nd Trim 2020 Port terminal located in the Port of Itaqui/MA, delegated its administration by the Ministry of Infrastructure to the Maranhense Port Administration Company EMAP (state public company). Brownfield area, with 33,607 m², dedicated to the movement of liquid fuels. The lessee is expected to expand static capacity by 30,000 m³, reaching more than 63,000 m³ by the end of the lease term • Expected Investment: US$ 16.35 million • Auction criterion: Highest Grant • Lease term: 20 years. • IRR: 9.38% • PPI Qualification: Resolution Nº 52, of May 8, 2019 Notice published: http://portal.antaq.gov.br/index.php/audiencia-publica-no-06-2019/ SFPP - ref: february 02, 2020 20 PORTS – Lease on Liquid Bulk Terminal on port of Itaqui/MA TCU Studies Public hearing (Federal court of accounts) Bidding Documents Public Auction IQI12 07/01/2019 10/16/2019 1st Trim 2020 2nd Trim 2020 Port terminal located in the Port of Itaqui/MA, delegated its administration by the Ministry of Infrastructure to the Maranhense Port Administration Company EMAP (state public company). Greenfield area, with 34.183 m², dedicated to the movement of liquid fuels. The lessee is expected to expand enough static capacity by 78,722 m³ by the end of the lease term. • Expected Investment: US$ 44.33 million • Auction criterion: Highest grant • Lease term: 20 years. • IRR: 9.38%. • PPI Qualification: Resolution Nº 52, of May 8, 2019. Notice published: http://portal.antaq.gov.br/index.php/audiencia-publica-no-06-2019/ SFPP - ref: february 02, 2020 21 PORTS – Lease on Liquid Bulk Terminal on port of Itaqui/MA TCU Studies Public hearing (Federal court of accounts) Bidding Documents Public Auction IQI13 07/01/2019 10/16/2019 1st Trim 2020 2nd Trim 2020 Port terminal located in the Port of Itaqui/MA, delegated its administration by the Ministry of Infrastructure to the Maranhense Port Administration Company - EMAP (state public company). Greenfield area, with 32,078 m², dedicated to the movement of liquid fuels. The lessee is expected to expand static capacity by 30,000 m³, reaching more than 63,000 m³ by the end of the lease term • Expected Investment: US$ 44.63 million • Auction criterion: Highest grant • Lease term: 20 years • IRR: 9.38%. • PPI Qualification: Resolution Nº 52, of May 8, 2019. Notice published: http://portal.antaq.gov.br/index.php/audiencia-publica-no-06-2019/ SFPP - ref: february 02, 2020 22 PORTS - Lease of cellulose terminal in the port of Paranaguá/PR TCU Studies Public Hearing (Federal court of accounts) Bidding Documents Public Auction PAR12 1st Trim 2020 2nd Trim 2020 Port terminal located in the Port of Paranaguá/PR, managed by the Administração dos Portos de Paranaguá e Antonina (APPA), which is linked to the Ministry of Infrastructure. Terminal for general cargo handling (vehicles and parts), with an area of 74,1 thousand m² and is located at the rear of the container terminal. • Expected Investment: US$ 5,55 million • Auction criterion: Highest Grant • Lease term: 25 years (under analysis) • IRR: 9.38%. • PPI Qualification: Decree Nº 9.059, of May 25, 2017. SFPP - ref: february 02, 2020 23 PORTS – Lease on Libra Terminal on port of Santos/SP Studies Public Hearing TCU (Federal court of accounts) Public Auction Bidding Documents STS14 09/10/2019 01/15/2020 2nd Trim 2020 3rd Trim 2020 Paved greenfield area of approximately 33,450 m², located in the Macuco region, on the right bank of the Port of Santos, State of São Paulo, dedicated to general cargo handling (pulp) and with an expected average handling of 1.6 million. tons / year • Expected Investment: US$ 33.48 million | OPEX: US$ 9.44 millions/year • Monthly Lease Value: US$ 204,750.00 • Variable Lease Value: US$ 2.09/t • Lease term: 25 years (under analysis) • Auction criterion: Highest grant • IRR: 9.38%. • PPI Qualification: Resolution Nº.69, of august 21, 2019. Notice published: http://portal.antaq.gov.br/index.php/audiencia-publica-no-09-2019/ SFPP - ref: february 02, 2020 24 PORTS – Lease on Libra Terminal on port of Santos/SP Studies STS14A 09/10/2019 Public Hearing 01/15/2020 TCU (Federal court of accounts) Public Auction Bidding Documents 2nd Trim 2020 3rd Trim 2020 Paved greenfield area of approximately 34,975 m², located in the Macuco region, on the right bank of the Port of Santos, State of São Paulo, dedicated to general cargo handling (pulp) and with an expected average handling of 1.6 million. tons / year • Expected Investment: US$ 36.48 million | OPEX: US$ 11.92 millions/year • Monthly Lease Value: US$ 317,500.00 • Variable Lease Value: US$ 2.46/t • Lease term: 25 years (under analysis) • IRR: 9.38%. • PPI Qualification: Resolution Nº.69, of august 21, 2019. Notice published: http://portal.antaq.gov.br/index.php/audiencia-publica-no-09-2019/ SFPP - ref: february 02, 2020 25 PORTS - Solid Bulk lease at the Port of Aratu-Candeias/BA TCU Studies ATU12 12/02/2019 Public Hearing (Federal court of accounts) Bidding Documents 3rd Trim 2020 Public Auction 4th Trim 2020 Located in the Organized Port of Aratu-Candeias/BA, dedicated to the movement of solid bulk, mainly fertilizers, copper concentrate and various minerals. It is an area composed of brownfield plots of approximately 190,000 m2, located in the Port of Aratu, State of Bahia, with an expected average handling of 2 million tons / year. • Expected Investment: US$ 70.14 million • Monthly Lease Value: US$ 24,000.00 • Variable Lease Value: US$ 0.18/t • Auction criterion: Highest Grant • Lease term: 25 years (under analysis) • IRR: 9.38%. • PPI Qualification: Resolution Nº 69, of august 21, 2019. http://web.antaq.gov.br/Sistemas/LeilaoInternetV2/default.aspx?audiencia=46 SFPP - ref: february 02, 2020 26 PORTS - Solid Bulk lease at the Port of Aratu-Candeias/BA TCU Studies Public Hearing (Federal court of accounts) Bidding Documents Public Auction ATU18 12/17/2019 3rd Trim 2020 4th Trim 2020 Located in the Organized Port of Aratu-Candeias/BA, with approximately 51, 561.61 m2 dedicated to the implementation of projects for handling and storage of organic bulk. An area is characterized as greenfield (without permanent structures). Therefore, the venture will be carried out on land mostly without existing structures. • Expected Investment: US$ 29.85 million (July / 2019 database) • Monthly Lease Value: in studies • Variable Lease Value: in studies • Average revenue per unit by product type handled R $ 40.28 per tonne • Lease term: 15 years • IRR: 9.38%. Notice published: http://web.antaq.gov.br/Sistemas/LeilaoInternetV2/default.aspx?audiencia=47 SFPP - ref: february 02, 2020 27 PORTS – Lease of general cargo handling terminal in the port of Paranaguá/PR TCU Studies Public Hearing (Federal court of accounts) Bidding Documents Public Auction PAR32 3rd Trim 2020 4th Trim 2020 Port terminal located in the Port of Paranaguá/PR, managed by the Administração dos Portos de Paranaguá e Antonina (APPA), which is linked to the Ministry of Infrastructure. Terminal for general cargo handling (vehicles and parts), with an area of 6,651 thousand m². SFPP - ref: february 02, 2020 • Expected Investment: US$ 4,97 million • Auction criterion: Highest grant • Lease term: 10 years • PPI Qualification: Qualified in the 11th meeting of the PPI of 11/19/2019 28 PORTS – Rental terminal for handling and storage of solid vegetable bulk in the Port of Porto de Santana/AP Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction MCP02 12/23/2019 3rd Trim 2020 4th Trim 2020 • Brownfield project • Estimated investments: US$ 10.34 million • Terminal Area: 3,186.74m². • Contract term: 25 years. • Auction Criteria: Highest Grant. • PPI Qualification: in the CPPI qualification procedure Notice published: http://web.antaq.gov.br/Sistemas/LeilaoInternetV2/default.aspx?audiencia=48 SFPP - ref: february 02, 2020 29 PORTS – Rental of terminal for handling and storage of liquid bulk (sulfuric acid) in the Port of Maceió / AL Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction MAC10 27/12/2019 3rd Trim 2020 4th Trim 2020 • Greenfield project • Estimated investments: US$ 3.20 milhões • Terminal Area: 7.392m². • Contract term: 25 anos. • Auction Criteria: Highest Grant. • Monthly rental amount: approximately US$ 8,7 mil/mês • Variable lease amount: aproximadamente US$ 10,2/ton • Future static capacity: 3.321m³ Notice published: http://web.antaq.gov.br/Sistemas/LeilaoInternetV2/PaginaPrincipal.aspx SFPP - ref: february 02, 2020 ª PORTS – Lease on Liquid Bulk Terminal on Port of Santos/SP Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction STS08 4th Trim 2020 1st Trim 2021 Port terminal located in the Port of Santos/SP, located in the Alamoa and Barnabé region, on the right bank of the Port of Santos, State of São Paulo, dedicated to the movement of liquid fuels, with an area of 137,3 thousand m². • Estimated investments: US$ 66.09 million • Contract term: under analysis. • Auction Criteria: Highest Grant. • Capacity: 48,815 m³ • PPI Qualification: Qualified in the 11th meeting of the PPI of 11/19/2019 SFPP - ref: february 02, 2020 31 PORTS – Lease on Liquid Bulk Terminal on Port of Santos/SP Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction STS08A 4th Trim 2020 1st Trim 2021 Port terminal located in the Port of Santos/SP, located in the Alamoa and Barnabé region, on the right bank of the Port of Santos, State of São Paulo, dedicated to the movement of liquid fuels, with an area of 305,7 thousand m². • Estimated investments: US$ 251.53 million • Contract term: under analysis. • Auction Criteria: Highest Grant. • Capacity: 122,937 m³ • PPI Qualification: Qualified in the 11th meeting of the PPI of 11/19/2019. SFPP - ref: february 02, 2020 32 PORTS - Lease of terminal for handling and storage of general cargo (sugar) in the Port of Maceió / AL Studies MAC13 Public Hearing TCU (Federal court of accounts) Bidding Documents 4th Trim 2020 SFPP - ref: february 02, 2020 • Brownfield project • Estimated investments: US$ 4.5 million • Auction Criteria: Highest Grant. Public Auction 1st Trim 2021 ª PORTOS – Arrendamento de terminal para movimentação e armazenagem de granel líquido no Porto de Recife/PE Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction REC40 4th Trim 2020 SFPP - ref: february 02, 2020 • Greenfield project • Terminal Area: 14.400 m² • Estimated investments: US$ 8.75 million (study received) • Auction Criteria: Highest Grant. 1st Trim 2021 ª PORTS - Lease of terminal for handling and storage of liquid bulk in the Port of Maceió/AL Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction MAC11 4th Trim 2020 SFPP - ref: february 02, 2020 • Brownfield project • Estimated investments: US$ 12.5 million • Auction Criteria: Highest Grant. 1st Trim 2021 ª PORTS - Lease of terminal for handling and storage of liquid bulk in the Port of Maceió/AL Studies MAC12 Public Hearing TCU (Federal court of accounts) Bidding Documents 4th Trim 2020 SFPP - ref: february 02, 2020 • Brownfield project • Estimated investments: US$ 7.5 million • Auction Criteria: Highest Grant. Public Auction 1st Trim 2021 ª PORTS - Lease of terminal for handling and storage of liquid bulk (fuels) in the Port of Paranaguá/PR Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction PAR50 4th Trim 2020 SFPP - ref: february 02, 2020 • Brownfield project • Terminal Area: 85.616m² • Estimated investments: US$ 37.5 million • Auction Criteria: Highest Grant. 1st Trim 2021 ª PORTS - Lease of terminal for handling and storage of mineral bulk at the Port of Vila do Conde / PA Studies VDC10 Public Hearing TCU (Federal court of accounts) Bidding Documents 4th Trim 2020 SFPP - ref: february 02, 2020 • Brownfield project • Estimated investments: US$ 100 million • Auction Criteria: Highest Grant. Public Auction 2nd Trim 2021 ª Ports – Companhia Docas of Espírito Santo (CODESA) Privatization TCU Studies CODESA Public hearing (Federal court of accounts) Bidding Documents 4th Trim 2020 Public Auction 2nd Trim 2021 Complex consists of the organized ports of Vitória and Barra do Riacho, managed by the Docas do Espírito Santo Company (Codesa), which is linked to the Ministry of Infrastructure. The Vitória Organized Port port facilities are in the municipalities of Vitória / ES and Vila Velha / ES, have 13 berths, 4 of which are leased, and have storage facilities for solid, liquid, containers and general cargo, distributed in warehouses, silos, tanking and courtyards. Barra do Riacho Port is in the municipality of Aracru / ES and does not have its own storage areas or equipment, since all operations are carried out at Portocel and TABR (TUP built by Petrobrás S.A) private use terminals. It has access by the federal highways BR-101, BR-262 and BR-447, state highways ES080 and ES-471 and extensions of the Vitória Minas Railroad (EFVM). Port of Victoria handled approximately 9.36 million tons in 2018, with container (2.7mt), marble / granite (1.5mt), steel products (773kt), machinery and vehicles (755kt). • Brownfield Project • Expected Investment: US$ 250 million (depends on the outcome of the studies) • Contract term: 35 years (under analysis) • Auction Criteria: under analysis • PPI Qualification: Resolution Nº 14, August 23, 2017. SFPP - ref: february 02, 2020 39 PORTS – São Sebastião Privatization São Sebastião Studies Public hearing TCU (Federal court of accounts) Bidding Documents 1st Trim 2022 Public Auction 2nd Trim 2022 It has a capacity of 20,000 tons. Access to the port complex comprises road (19.8 km long) road (federal and state) and pipeline access. In 2016, it handled 47,079,803 tons of various products. The mooring infrastructure consists of a pier with 5 berths. All major port cargo is handled through Berth 101. In the other berths, smaller docks that operate general cargo. The Public Port operates cargoes of different natures, such as Roll-on / Roll-off (RO-RO), bulk and general cargo, and its retro-area is divided into various types of storage structures, including courtyards, warehouses and silos • Brownfield Project. • Expected Investment: US$ 143.59 million • Contract term: 35 years (depends on the outcome of studies) • Auction Criteria: under analysis • PPI Qualification: Resolution Nº 52, of 05/08/19 SFPP - ref: february 02, 2020 40 PORTS – Santos Organized Port Privatization Organized Port of Santos Studies Public hearing TCU (Federal court of accounts) Bidding Documents 1st Trim 2022 Public Auction 2nd Trim 2022 Port of Santos - waterway access by 25 km long channel, capable of receiving vessels up to 336 m long, 46 m beam and 13.5 m draft, whose dimensions are reduced further into the continent. The port has high connectivity: road access through the Anchieta-Imigrantes System, Cônego Doménio Rangoni Highway, BR-101 (Santos River) and SP-55 (Padre Manoel da Nóbrega Highway); railway and by the extensions of MRS Logística, Ferrovia Centro-Atlântica S.A. (FCA) and Rumo Malha Paulista (RMP); pipeline by the lines of Petrobras Transporte S.A. - Transpetro; and waterway through the Tietê-Paraná waterway. The Santos port complex handled, in 2018, 133.2 million tons, of which approximately 107.5 million tons were from the public port; and • Brownfield Project. • Expected Investment: US$ 375 million (under analysis) • Contract term: 35 years • Auction Criteria: highest grant • PPI Qualification: Resolution Nº 69, of august 21, 2019. Notice published: http://web.antaq.gov.br/Sistemas/LeilaoInternetV2/default.aspx?audiencia=46 SFPP - ref: february 02, 2020 41 Highways Partnership Projects SFPP - ref: february 02, 2020 42 Highway – Project Portfolio BR-163/230/MT/PA Investiments: US$ 482,5 millions Extension: 970 km RR AP BR-158/155/MT/PA Extension: 1.135 km BR-153/080/414/GO/TO Investiments: US$ 1.89 billion Extension: 850,7 km Santana Belém BR-116/304/CE/RN Extension: 533 km Santarém Fortaleza Itaituba AM MA CE Salgueiro PI Porto Velho AL Aliança do Tocantins RO Feira de Santana Barreiras Divisa Alegre GO MG Itumbiara BR-452/GO Extension: 199 km 18,160.22 Km Highways Integrated of Paraná Investiments: US$ 8.4 billions Extension Total: 4.114 km Extension Federal: 2.806 km Juiz de Fora Londrina São Paulo Guaíra Ubatuba Projects SFPP - ref: february 02, 2020 ‘’ Public Auction Qualified as studies Current concession Viana RJ Rio de Janeiro BR-040/495/MG/RJ (Concer) Juiz de Fora/MG ao Rio de Janeiro/RJ Investiments: US$ 650 millions Extension: 211 km Navegantes Paulo Lopes Campos Novos Panambi RS SC Pântano Grande BR-282/SC Extension: 310,30 km São João do Sul Porto Alegre Camaquã Rio Grande Jaguarão BR-381/262/MG/ES Investiments: US$ 2.27 billions Extension: 672 km BR-116/493/RJ/MG (CRT) Rio de Janeiro / RJ a Gov. Valadares/MG Investiments: US$ 1.97 billions Extension: 711 km Além Paraíba Curitiba Guarapuava Santana da B. Vista BR-158/392/RS Extension: 321 km BR-116/MG Extension: 409 km PR Foz do Iguaçu BR-235/SE Extension: 55,40 km ES SP Irani BR-470/282/153/SC Investiments: US$ 2 billions Extension: 502,10 km Gov. Valadares Belo Horizonte MS Maringá BR-101/BA/SE/AL/PE/PB/RN Extension: 1.835 km BR-251/MG Extension: 342 km Uberlândia BR-040/DF/GO/MG Extensão: 936,8 km (relicitation) Recife BR-020/DF/GO/BA Extension: 587 km Montes Claros DF Anápolis Jataí Projects: By the Numbers BR-232/PE Extension: 273 km BR-116/BA/PE Extension: 495 km BA MT Extension Aracaju Comodoro Rondonópolis João Pessoa SE Sinop US$ 36.17 bi Natal Campina Grande Arco PB Verde TO BR-364/MT/RO Extension: 804 km Investments RN PE AC BR-364/060/MT/GO Extension: 718 km BR-230/PB Extension: 128 km PA BR-101/SC Investiments: US$ 850 million Extension: 220,42 km BR-116/290/RS Extension: 229 km BR-116/465/101/SP/RJ (Dutra) Rio de Janeiro/RJ ; São Paulo/SP e Ubatuba/SP Investiments: US$ 4.25 billions Extension: 598,5 km 43 Highway – Project Portfolio Studies Public Hearing 09/21/2018 05/10/2019 TCU (Federal court of accounts) Bidding Documents Public Auction 09/23/2019 11/07/2019 02/21/2020 07/31/2019 3rd Trim 2020 4th Trim. 2020 1st Trim 2021 08/28/2019 3rd Trim 2020 4th Trim 2020 1st Trim 2021 12/18/2019 3rd Trim 2020 4th Trim 2020 1st Trim 2021 07/17/2019 3rd Trim 2020 4th Trim. 2020 1st Trim 2021 3rd Trim 2020 4th Trim. 2020 2nd Trim 2021 3rd Trim 2020 4th Trim. 2020 2nd Trim 2021 1st Trim 2021 2nd Trim 2021 3rd Trim. 2021 2nd Trim 2021 3rd Trim. 2021 4th Trim 2021 2nd Trim 2022 3rd Trim 2022 4th Trim 2022 2nd Trim 2022 3rd Trim 2022 4th Trim 2022 Contract - BR-101/SC - BR-153/080/414/GO/TO 2nd Trim 2020 - BR-163/230/MT/PA - BR-116/465/101/SP/RJ (Dutra) -BR-381/262/MG/ES - BR-040/495/MG/RJ (Concer) - BR-116/493/RJ/MG (CRT) - BR-470/282/153/SC - Highways Integrated of Paraná - Highways 8.200 km - BR-158/155/MT/PA SFPP - ref: february 02, 2020 Legenda das etapas: Encerrada Em andamento Não iniciada 44 Highway – BR-101/SC Concession of 220.42 km of BR-101 from Palhoça/SC to the state limit of SC/RS Studies 09/21/2018 Public hearing 05/10/2019 TCU (Federal court of accounts) Bidding Documents Public Auction 09/23/2019 11/07/2019 02/21/2020 • • • • • • • • Length: 220.42 km Traffic: 25.6 thousand vehicles/day on average Estimated Investment: US$ 850 million Concession term: 30 years Auction criterion: lowest fare Fare: US$ 1.29 IRR: 9.2% The works will enable the expansion of capacity and quality of service, reducing accidents and congestion, improving traffic, as well as a significant contribution to the economic development of the region. • PPI Qualification: Resolution No. 10 of March 7, 2017 SFPP - ref: february 02, 2020 45 Highway– BR-153/080/414/GO/TO Concession of 850.7 km of BR-153/080/414 from Anápolis/GO to Aliança do Tocantins/TO. Studies 07/31/2019 Public hearing TCU (Federal court of accounts) Bidding Documents Public Auction 3rd Trim 2020 4th Trim 2020 • • • • • • • Length: 850.7 km. Expected Investment: CAPEX: US$ 1.89 billion | OPEX: US$ 1.06 billion. Concession term: 30 years. Auction criterion: lower fare (limited discount) and higher grant as a tiebreaker Fare: US$ 2.82 (single lane) and US$ 3.67 (double lane). IRR: 9.2% It is one of the main access roads to the central region of Brazil, especially to the states of Tocantins and Goiás, and is a link between the south and the north of the country. It is a fundamental element for the development of the region, enabling the flow of producing areas through 23 municipalities. • PPI Qualification: Resolution No. 14 of August 23, 2017 e Resolution No. 52 of May 8, 2019. Notice published: https://participantt.antt.gov.br/Site/AudienciaPublica/VisualizarAvisoAudienciaPublic a.aspx?CodigoAudiencia=397 SFPP - ref: february 02, 2020 46 Highway – BR-163/230/MT/PA Studies Concession of 970 km of BR 163/230 from Sinop/MT to Miritituba/PA. 08/28/2019 Public Hearing TCU (Federal court of accounts) Bidding Documents 3rd Trim 2020 Public Auction 4th Trim 2020 • Length: 970 Km. • Traffic: 6 thousand cars/day. • Expected Investment: US$ 422.5 million | OPEX: US$ 255 million • Concession term: 10 years. • Auction criterion: lower fare • Fare: US$ 2.20. • IRR: 9.2% • The concession will improve the quality of the road, making the axis more attractive for grain flow. The project tends to minimize investments and operating costs in order to make it viable, considering Ferrogrão's expected start-up, which would absorb practically all of BR's demand. • PPI Qualification: Resolution No. 52 of May 8, 2019. Notice published: https://participantt.antt.gov.br/Site/AudienciaPublica/VisualizarAvisoAudienciaPublica.asp x?CodigoAudiencia=405 SFPP - ref: february 02, 2020 47 Highways – BR-116/465/101/SP/RJ (Dutra) Concession of 635 km of BR116/465/101/SP/RJ from Rio de Janeiro/RJ to São Paulo/SP Studies Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction 3rd Trim 2020 4th Trim 2020 • Length: 598.5 km • Expected Investment: US$ 4.25 billion • Auction criterion: highest grant • IRR: 9.2% • Connects the two largest metropolitan regions of the country (Rio de Janeiro and São Paulo). In addition, it is part of the main link between the Northeast and the South, going through 34 cities PPI Qualification: Decree No. 9,059, of May 25, 2017 SFPP - ref: february 02, 2020 48 Highways – BR-381/262/MG/ES Studies Concession of 672 km of BR 381/262 from Belo Horizonte/MG to Governador Valadares/MG and Viana/ES. 07/17/2019 Public Hearing TCU (Federal court of accounts) Bidding Documents 3rd Trim 2020 Public Auction 4th Trim 2020 • Length : 672 Km • Traffic: More than 112 thousand vehicles per day • Expected Investment: US$ 2.27 billion | OPEX: US$ 1.4 billion • Concession term: 30 years • Auction criterion: lower fare (limited discount) and higher grant as a tiebreaker • Fare: US$ 2.13 (single lane) and US$ 2.77 (double lane) • IRR: 9.2% • BR-262 connects Espírito Santo (ES) and Mato Grosso do Sul (MS) through Belo Horizonte, São Paulo and cuts municipalities specialized in agricultural and livestock products. The BR381, mostly concentrated in Minas Gerais (MG), is a corridor for industrial products flow and crosses the Steel Valley. • PPI Qualification: Resolution No. 52 of May 8, 2019 Notice published: https://participantt.antt.gov.br/Site/AudienciaPublica/VisualizarAvisoAudienciaPublica.aspx?Co digoAudiencia=392 SFPP - ref: february 02, 2020 49 Highways – BR-040/495/MG/RJ (Concer) Concession of 211km of BR040/495/MG/RJ from Juiz de Fora/MG to Rio to Janeiro/RJ Studies Public Hearing TCU (Federal court of accounts) Bidding Documents 3rd Trim 2020 Public Auction 4th Trim 2020 • Length: 211 km • Expected Investment: US$ 650 million • Auction criterion: highest grant • IRR: 9.2% • Connects Rio de Janeiro to Juiz de Fora/MG. Main road corridor between the states of Minas Gerais (MG) and Rio de Janeiro (RJ), besides being a relevant section on the radial highway that connects Brasilia and Rio de Janeiro • PPI Qualification: Decree No. 9,059, of May 25, 2017. SFPP - ref: february 02, 2020 50 Highways – BR-116/493/RJ/MG (CRT) Studies Concession of 711 km of BR116/RJ from Além Paraíba to BR-040 Public Hearing TCU (Federal court of accounts) Bidding Documents 3rd Trim 2020 Public Auction 4th Trim 2020 • Length: 711 km • Expected Investment: US$ 1.97 billions • Auction criterion: highest grant • IRR: 9.2% • The only route from the city of Rio de Janeiro to bypass Guanabara Bay, allowing access to the northern Lagos region, as well as the North and Northeast regions of Brazil • PPI Qualification: Resolution No. 52 of May 8, 2019 SFPP - ref: february 02, 2020 51 Highway – BR-470/282/153/SC Concession of 502.10 km of BR-470/282/153 from Navegantes/SC to the State line of RS/SC Studies Public hearing TCU (Federal court of accounts) Bidding Documents Public Auction 1st Trim 2021 2nd Trim 2021 • • • • • • • Length: 502.10 km Expected Investment: US$ 2 billion Concession term: 35 years (initial proposal) Auction criterion: lower fare (limited discount) and higher grant as a tiebreaker Fare: US$ 4.25 (under analysis) IRR: 9.2% The segment intercepts more than 20 municipalities and, through the roads involved, circulate products destined to the ports of Paranaguá/PR, Itajaí/SC and Santos/SP, besides supplying important cities of the states of Paraná (PR), Santa Catarina (SC), Rio Grande do Sul (RS), São Paulo (SP), Mato Grosso do Sul (MS), Goiás (GO) and Minas Gerais (MG). • PPI Qualification: Resolution No. 44 of July 2, 2018. SFPP - ref: february 02, 2020 52 Highways – Paraná Integrated Studies Paraná Highways. Total Extension: 4,114 km; Federal Extension: 2,806 km Public Hearing TCU (Federal court of accounts) Bidding Documents Public Auction 2nd Trim 2021 3rd Trim 2021 • • • • Highways Federal Concessions Extension (km) 1.856,1 State Concessions 469,0 Federal Propositions 950,6 State Propostions 839,0 Total SFPP - ref: february 02, 2020 Length: 4,114 km; Federal Length: 2,806 km Expected Investment: US$ 8.4 billion IRR: 9.2% Involved axes that connect the port of Paranaguá, the Metropolitan Region of Curitiba (29 municipalities), the western and northern regions of the state and the Friendship Bridge, on the border with Paraguay. Mercosur Corridor (São Paulo - Buenos Aires axis), is an important international connection and is inserted in a region of great commercial and tourist appeal • PPI Qualification: Resolution No. 52 of May 8, 2019 4.114,7 53 Highways – 8.200km Studies Studies for the concession of road sections that encompass 8,175.5 km in 14 Brazilian states Public Hearing TCU (Federal court of accounts) Bidding Documents 2nd Trim 2022 AP Trecho Início BR-101/BA/SE/AL/PE/PB/RN BR-116/304/CE/RN BR-116 BA/PE BR-230/PB BR-116/MG BR-251/MG BR-020/DF/GO/BA BR-116/290/RS BR-158/392/RS BR-232/PE BR-452/GO BR-364/060/MT/GO Divisa ES/BA Natal-RN Feira de Santana-BA João Pessoa-PB Governador Valadares-MG Montes Claros-MG Planaltina-DF Camaquã-RS Panambi-RS Recife-PE Rio Verde-MG Rondonópolis-MT Entroncamento com a BR101 (Aracajú-SE) Entr. BR-101(B) (Palhoça) Brasília - DF Comodoro-MT Fortaleza PA MA CE RN Campina Grande Salgueiro PI Porto Velho AC PB Arco Verd e PE S E RO Feira de Santana BA Barreiras MT Comodoro GO Divisa Alegre Brasília D F Goiânia Jataí Montes Claros MG Gov. Valadares Itumbiara Belo Horizonte ES MS Juiz de Fora SP PR Campos Novos RJ Nata l João Pessoa Rec ife TO Rondonópolis A L Aracaju BR-235/SE SC Palhoça Panambi RS Pântano Grande Santana da B. Vista SFPP - ref: february 02, 2020 Porto Alegre Camaquã 3rd Trim 2022 • Length: 8,175,5 km. • Expected Investment: US$ 13.4 billion. • IRR: 9.2% • PPI Qualification: Resolution No. 52 of May 8, 2019. RR AM Public Auction BR-282/SC BR-040 (DF/GO/MG) BR-364/MT/RO Extensão (km) Natal-RN 1.835 Fortaleza-CE 533 Salgueiro-PE 495 Campina Grande-PB 128 Divisa MG/BA 409 Entroncamento BR-116/MG 342 Barreiras-BA 587 Pântano Grande-RS 229 Santana da Boa Vista-RS 321 Arco Verde-PE 273 Entr. BR-153 199 Goiânia-GO 718 Entroncamento com a SE175 55,4 (Itabaiana-SE) Entr. BR-470(A) 310,3 Juiz de Fora - MG 936,8 Porto Velho-RO 804 TOTAL 8.175,5 Fim 54 Highways – BR-158/155/MT/PA Studies Ribeirão Cascalheira/MT Marabá/PA Public Hearing TCU (Federal court of accounts) Bidding Documents 2nd Trim 2022 SFPP - ref: february 02, 2020 Public Auction 3rd Trim 2022 • Length: 1,135.1 km • Concession term: 30 years • IRR: 9.2% • • PPI Qualification: Resolution No 104/2019 of november 19, 2019 To promote the logistics of the northeast region of the MT, which shows significant growth in agricultural production and is currently the second largest in the State in soybean and corn production, contributing to the regional development of the central-west and north of the country, of which important roads are part. 55 Railways Partnership Projects SFPP - ref: february 02, 2020 56 Railways – Project Portfolio EF-170 – Ferrogrão Investiments: US$ 1.82 billion Extension: 933 km RR AP Santana Contract Extension EFC Extension: 892 km Belém São Luis Santarém Fortaleza Itaituba AM Açailândia Marabá PA Macau CE MA RN Natal Carajás Crato PB Salgueiro PI PE AC Juazeiro TO AC Integration Railway Central-West (FICO) Investiments: US$ 682,5 million Extension: 383 km SE Aracaju Sinop Alagoinhas BA MT Salvador Caetité Mara Rosa Água Boa Rondonópolis • renew – 13,060 km Pirapora Goiânia MG Uberlândia Araguari Belo Estrela Horizonte d’Oeste MS Campo Grande 14,530 Km: • new - 1,470 km Montes Claros DF Anápolis US$ 12.54 bi: Total extension Brasília GO Corumbá Ponta Porã SP Barra Mansa Bauru São Paulo Cianorte Current concession Qualified (new) Qualified for renewals : Dealers Cross Investment FICO EFVM FCA MRS RMP SFPP - ref: february 02, 2020 EFC PR Cascavel Porto União São Borja Uruguaiana RS RJ Vitória Contract Extension Vitória Minas (EFVM) Extension: 895 km Campos Rio de Janeiro São Francisco do Sul SC Lajes Cruz Alta Sta. Maria ES Curitiba Paranaguá Guarapuava Sta. Rosa Contract Extension FCA Extension: 7.215 km Gov. Valadares Juiz de Fora Panorama Pres. Epitácio Santos Projects West-East Integration Railway (FIOL) – EF – 334 Investiments: US$ 825 millions Extension: 537 km Ilhéus Projects: by the Numbers • new – US$ 2.65 bi • renew – US$ 9.89 bi Barreiros Maceió AL Aliança do Tocantins RO Investments João Pessoa Recife Imbituba Criciúma Contract Extension MRS Logística S.A. Extension: 1.686 km Porto Alegre Santana do Livramento Rio Grande Contract Extension Rumo Malha Paulista Extension: 1.989 km 57 Railways – Project Portfolio Studies -EF-334 – FIOL 08/29/2018 Public Hearing TCU (Federal court of accounts) 11/25/2019 Bidding Documents Public Auction 2nd Trim 2020 3rd Trim 2020 3rd Trim 2020 4th Trim 2020 -EF-170 – Ferrogrão 05/19/2017 Studies Public Hearing TCU (Federal court of accounts) -Contract Extension Malha Paulista 12/12/2016 10/12/2018 12/17/2019 Legal Opinion Subscription of the Addendum 1st Trim 2020 -Contract Extension Carajás (EFC) 08/08/2018 07/01/2019 2nd Trim 2020 -Contract Extension Vitória-Minas (EFVM) 08/08/2018 07/01/2019 2nd Trim 2020 -Contract Extension MRS 4th Trim 2020 06/13/2018 SFPP - ref: february 02, 2020 Completed In progress 58 To be performed West-East Integration Railway (FIOL) – EF-334/ BA Studies EF-334 Ilhéus-BA - Caetité-BA 08/29/2018 Public hearing 11/25/2019 TCU (Federal court of accounts) Bidding Documents 2nd Trim 2020 Public Auction 3rd Trim 2020 • • • • • • • Length: 537 km. Demand: 17 million tons in 2024 and 34.4 million in 2054 (under analysis). Expected Investment: US$ 825 millions, of which US$ 400 billion to complete the works Subconcession term: 30 years. Auction Criteria: Highest grant amount (US$ 39.28 millions, minimum under analysis) IRR: 11,04%. Brownfield rail project linking the starting point in the city of Ilhéus (BA) with the arrival point in the city of Caetité/BA, with an approximate length of 537 km. It will drain iron ore produced in the region of Caetité/BA and the production of grains and ore from western Bahia (Minas da Bahia Mineração - BAMIN) through Porto Sul, a port terminal to be built near the city of Ilhéus / BA. It may establish the connection of this port with the North-South Railway (FNS) in the future. • PPI Qualification: Resolution No. 2 of September 13, 2016. Notice published: http://www.antt.gov.br/participacao_social/audiencias/0102018.html SFPP - ref: february 02, 2020 59 Railway EF-170 – MT/PA - Ferrogrão Studies EF-170 Lucas do Rio Verde/MT – Sinop/MT – Itaituba/PA 05/19/2017 Public hearing TCU (Federal court of accounts) Bidding Documents Public Auction 3rd Trim 2020 4th Trim 2020 • New rail corridor for export by Arco Norte. • Length: 933 Km. • Demand: expected cargo of 25 million tons in 2020 and 42 million tons in 2050 (under analysis). • Expected Investment: US$ 1.82 billion. • Concession term: 65 years, will start operations in 2030. • Auction Criteria: Highest grant amount (under analysis). • IRR: 11,04% • Greenfield project for the construction of a railway that will connect the starting point in the city of Sinop (MT) to the finishing point in the city of Miritituba (PA), with an approximate length of 933 km. It aims to improve the flow of agricultural production from the Midwest through connection to the port of Miritituba in the state of Pará. • PPI Qualification: Resolution No. 2 of September 13, 2016. Notice published: • http://antt.gov.br/participacao_social/audiencias/0142017.html SFPP - ref: february 02, 2020 60 Rumo Malha Paulista Renewal (RMP) Studies RMP – Rumo Malha Paulista S.A. 12/12/2016 Public hearing 10/12/2018 TCU (Federal court of accounts) 12/17/2019 Legal Opinion Subscription of the Addendum 1st Trim 2020 • • • • • Length: 1,989 km. Forecast Grant: US$ 550 million Expected Investment: US$ 1.44 million (ANTT source) Contract term: extension for another 30 years The main commodities handled in 2016, in thousands of usable tons, were: corn (5,880), soybean (4,814), sugar (4,033), soybean meal (3,029), iron ore (2,159 ), diesel oil (1,376), containers (798), cellulose (742), alcohol (664), manganese (598) and gasoline (188). Many flows come from the North and West meshes, bound for Santos. • PPI Qualification: Decree No. 9,059, of May 25, 2017. SFPP - ref: february 02, 2020 61 Carajás Railway Renewal (EFC) Estrada de Ferro Carajás (EFC) Studies Public hearing 08/08/2018 07/01/2019 TCU (Federal court of accounts) Legal Opinion Subscription of the Addendum 2nd Trim 2020 • • • • • Length: 892 km. Forecast Grant: US$ 57,82 million. Expected Investment: US$ 2.05 billion (ANTT source). Contract term: extension for another 30 years. The main goods handled in 2016, in thousands of usable tons, were: iron ore (151,605), manganese (1,600), pig iron (845), fuel (716) and copper (463). • PPI Qualification: Decree No. 9,059, of May 25, 2017. SFPP - ref: february 02, 2020 62 Vitória Minas Railway Renewal (EFVM) Public hearing Studies Estrada de Ferro Vitória Minas (EFVM) 08/08/2018 TCU (Federal court of accounts) 07/01/2019 • Length: 895 km. • Forecast Grant: US$ 380 million. • Expected Investment: US$ 2.20 billion Legal Opinion Subscription of the Addendum 2nd Trim 2020 (Including US$682 billion from the partial construction of FICO - ANTT source). • Contract term: extension for another 30 years. • The main goods handled in 2016, in thousands of usable tons, were: iron ore (116,228), steel products (4,535), mineral coal (3,878), pulp (1,132), logs of wood (844), pig iron (758), potassium chloride (585), coke (298) and anthracite (243). • PPI Qualification: Decree No. 9,059, of May 25, 2017. SFPP - ref: february 02, 2020 63 MRS Logística S.A. Railroad Renewal Studies Public hearing TCU (Federal court of accounts) Legal Opinion Subscription of the Addendum MRS Logística S.A. 06/13/2019 4th Trim 2020 • • • • • Length: 1,686 km Forecast Grant: US$ 550 million. Expected Investment: US$ 4.19 billion (ANTT source). Contract term: extension for another 30 years. The main goods handled in 2016, in thousands of usable tons, were: iron ore (123,850), steel products (5,170), sugar (3,103), cement (1,586), mineral coal (1,489), coke (943), loaded container (879), bauxite (856), cellulose (773), sand (770), pig iron (651), salt (263), soy (254) and steel limestone (204). • PPI Qualification: Decree No. 9,059, of May 25, 2017. SFPP - ref: february 02, 2020 64 Central-West Integration Railway (FICO) EF-354 Mara Rosa/GO – Água Boa/MT Mara Rosa SFPP - ref: february 02, 2020 • Length: 383 km. • Expected Investment: US$ 682.5 million (ANTT source) • Execution: It shall be offset against the grant amount in the early extension of the EFVM • Aims to drain grain production from the region of Água Boa/MT towards the ports of Santos/SP, Itaqui/MA and, in the future, Vila do Conde/PA. Investments arising from the renewal of the contract with the Vitória Minas Railway (EFVM) PPI Qualification: Resolution No. 41 of July 2, 2018. 65 PROJECTS PIPELINE 2020 2021 6th Round of Concessions: Blocks SOUTH (9), NORTH I (7) and CENTRAL (6) Total 22 airports| Total US$ 1.68 Bi 2022 7th Round of Concessions: Blocks RJ-MG (7), NORTH II (7) and SP-MS (5) Total 19 airports| Total US$ 1.32 Bi Disposals of Infraero shares in Guarulhos, Galeão, Confins and Brasília Leasings : Aratu/BA (2), Itaqui/MA (4), Santos/SP (2), Maceió (1), Paranaguá/PR(2), Fortaleza/CE(1), Santana/AP(1), Total 13 terminals | At least US$ 0.3 Bi Leasings : Santos/SP (2), Maceió (3), Paranaguá (1), Recife (1), Vila do Conde (1) Privatization CODESA Total 3 Ports and 8 terminals | At least US$ 0.73 Bi Concessions: BRs 101/SC(220,4 km) , 153/080/414/GO/TO (850,7 km), 163/230/MT/PA(970km), 116/SP/RJ (Dutra) (598,5 km), 381/262/MG/ES(672km), 040/495/MG/RJ (Concer) (211 km), BR-116/493/RJ/MG (CRT) (711km) Concessions: 470/282/153/SC (502,10 km) Highways Paraná Integrated (4,114 km) Privatization São Sebastião and Organized Port of Santos Total 2 Ports | At least US$ 0.52 Bi 8.200 km Estudos (BNDES e EPL); BR-158/155/MT/PA (1,135 km) Total: 4,616.1 km|at least US$ 10.4 Bi Total 4,233.62 km | Total US$ 12.37 Bi Concessions: Ferrogrão (933 km), FIOL Ilhéus/Caetité (537 km) Renewal : MRS (1.686 km), EFC (892 km), EFVM (895 km) e Rumo MP (1.989 km) With investment in: FICO – Mara Rosa/Água Boa (383 km) Total 9,311 km | At least US$ 13.4 Bi Renewal : FCA (7.215 km) ,Rumo Malha Sul (7.265 km) e Malha Oeste (1.945 km) Concessions FIOL – Caetité/Barreiras/Figueirópolis (1.005 km) Total 15,485 km | At least US$ 2.02 Bi Total 6,932 km | Total US$ 12.54 Bi 66 SFPP - ref: february 02, 2020